Structure

  • Earthquake Resistant RCC frame structure designed for seismic zone-4. Floor slab to Floor slab height to be 3050 mm. Design approved by IIT / NIT / Equivalent as specified by DTCP, Chandigarh

Flooring#

  • Living Room & Dining Area- Double Charged Vitrified Tile
  • Master Bedroom- Laminated Wooden# flooring#, grade III 8 mm thick
  • Other Bedrooms/Study Room-Vitrified Tiles
  • Kitchen/Toilets/Balcony/Service Balcony- Ceramic Tiles

Walls & Ceiling

  • Living Room & Dining Area/Master Bedroom / Other Bedrooms/ Study Room – Plastered and a coat of Putty finished with Acrylic Emulsion Paint. Ceiling shall be in white colour. Walls in pastel shade.
  • Kitchen - Ceramic Tiles up to 2 feet above counter, balance area Plaster, Putty and Acrylic Emulsion Paint. Cabinets above and below the counter made of MDF boards with hardware and fittings. Counter shall be of granite.#.
  • Toilets - Ceramic Tiles up to 7 feet height.Balance area Plaster, Putty and Acrylic Emulsion Paint in white colour
  • Balcony/Service Balcony- MS Railings duly painted in enamel paint. External texture Paint on walls - Acrylic emulsion paint in white color on the ceiling

Windows &
External Doors

  • Living Room & Dining Area/Master Bedroom/Other Bedrooms/Study Room/Toilets and Kitchen-UPVC Sliding doors and /orwindows with glazing only. Latch shall be provided from inside.

Doors &
Door Frames

  • Living Room & Dining Area- 8 Feet height pre-laminated door shutter with brass hardware (Mortice lock, tower bolt, door stopper and magic eye). Door frame to be of hard wood duly polished.
  • Master Bedroom / Other Bedrooms/Study Room/Kitchen/Toilets -7 Feet height moulded skin door shutter painted with enamel paint.Stainless steel / brass hardware ( Mortice lock, tower bolt, door stopper). Door frame to be of hard wood painted with enamel paint.

Plumbing

Kitchen

  • Concealed CPVC pipelines for the supply of hot and cold water (without geyser).
  • SS sink with single bowl and drain board and wall mounted swivel Spout.
  • Location shall be provided for fixing RO system and a small Geyser.
  • Plumbing and electrical point shall be provided.

Toilet

  • Concealed CPVC pipelines for supply of hot and cold water (without geyser).
  • C P Fitting and sanitary ware of reputed brand. (Rocca/ Kohler / Jaquar / Grohe or equivalent)
  • WC with cistern (Rocca/ Kohler / American Standard or equivalent) and health faucet
  • Granite Counter with Wash basin (Rocca/ Kohler / American Standard or equivalent).
  • Glass partition in shower area.
  • Mirror and Towel rail
  • Location shall be provided for fixing geyser along with plumbing and electrical points

Service Balcony

  • Water drainage outlet shall be provided
  • Water inlet point shall be provided only in the Service Balcony attached with the kitchen

Electrical

Living Room & Dining Area/Master Bedroom / Other Bedrooms/ Study Room

  • Copper wiring in concealed PVC conduits along with copper pipe & drain pipe for Split AC and modular switches Refer Annexure-A

Kitchen

  • Copper wiring in concealed PVC conduits along with modular switches.
  • Provision for fixing small Geyser , Chimney and RO System will be provided. Refer Annexure-A

Toilets

  • Copper wiring in concealed PVC conduits along with modular switches.
  • Provision for fixing a small Geyser will be provided.

Balcony

  • Copper wiring in concealed PVC conduits along with modular switches.
  • Power point for washing machine will be provided in the service balcony attached with the kitchen only. Refer Annexure-A.

Lifts

  • 1 passenger lifts & 1 stretcher / service lift in each building of reputed make such as OTIS / SCHINDLER / KONE / Thyssenkrup / or similar

Typical Floor - Lifts Lobbies & Corridor

  • Flooring in attractive designs of ceramic tiles / vitrified tiles.
  • Wall to be finished in a mixed pattern of tiles/ stone and texture paint.
  • Ceiling shall be plastered and a coat of putty duly finished by white color oil bound distemper
  • Ceiling lights shall be provided.
  • Window opening in corridor shall be as per direction of the fire department.

Ground Floor Lobby

  • Extra height of lobby.
  • Waiting lounge for visitors.
  • Flooring in mix design of marble, granite and tile.(Any one or more)
  • Wall paneling and false ceiling with lighting.
  • Reception area
  • Mail boxes for each flat
  • Small kids zone

External Finish

  • Building shall be finished in a mix of texture and plain paint.

Electric Connection & Power Back-Up

  • Each apartment at our luxury project in Gurgaon shall be provided with suitable 3 phase electricity connections through state electricity Distribution Company. 8 KW for Type - A, 8 KW for Type - B, 6 KW for Type-C. Connection shall be provided based on diversity factors as allowed by the Regulatory Authority. Meter connection charges including cost of meter, deposit, supervision cost and line charges shall be charged separately at the time of offer for possession. Recurring monthly charges shall be extra.
  • Power back up of 5 KW for Type A (3BHK + 3Toilets), 4 KW for Type B (2BHK +Study + 2 Toilets) and 4 KW for Type C (2 BHK+ 2 Toilets ) and in common areas with overall suitable diversity factor shall be provided. Recurring monthly cost shall be charged extra.)

Wi-Fi

  • Provision for Wi-Fi enabled common areas through specialized service provider. Usage charges to be paid to the service provider

Piped Cooking Gas

  • • Provision for Pipe Cooking Gas supply connection at an extra cost shall be made in each Apartment. Gas supply along with pipe cooking gas system maintenance shall be outsourced to a third party specialised vendor. Allottee shall be billed by the authorised gas vendor for recurring gas consumption as per his monthly consumption alongwith a fixed monthly cost for monthly maintainance

Electric Meter

  • Pre Paid Electric Meter and Billing System shall be installed. Meter cost, Connection charges, Recurring user charges shall be paid extra by the allottee

Water Supply

  • Supply of filtered drinking water through centralized water filtration plant via underground tank and overhead tanks. Till such time supply of drinking water is not provided by HUDA / Municipal Corporation the Developer shall arrange to provide the same through water tankers. The cost for it shall be borne by all the allottee proportionately in addition to the Common Area Maintenance charges

Club House

  • Air-conditioned Club
  • Lounge and Cafe with seating and TV
  • Spa with facilities for Steam, Jacuzzi
  • Gymnasium
  • Banquet Hall cum Badminton court
  • Guest Rooms * (Provided in one tower)
  • Indoor Games Room with Table Tennis, Pool table, Billiards table and Carom
  • Indoor kids play zone
  • Home Theatre

Sports Facility

  • Lawn Tennis courts (1 Nos.)
  • Squash court (1 Nos.)
  • Outdoor Swimming Pool and Kids Splash Pool
  • Outdoor Basket Ball court
  • (Half court)
  • Outdoor kids play area with Swings and Slides.

  • *Monthly Recurring Charges Extra.

Ashiana Mulberry Offer

  • No Phase -1 offer left.
  • All Units in Phase -1 are sold out.